04.11.2017
Major repairs were performed at the open pit mine No. 8 and the rough concentrates factory of the Irshansk Mining and Processing Plant from October 17 until October 26.
01.11.2017
In October, Vilnohirsk Mining and Metallurgical Plant completed the work on replacement of nearly 2 km of exhausted pulp pumps for the total amount of UAH 5.2 mn...
26.10.2017
On October 26, four 21-ton MAZ dump trucks, a 25-ton crane truck with a 28-m beam, two PAZ buses for transportation of workers...
19.10.2017
Ukraine has amazing mineral resources: a country that occupies only 0.4% of terrestrial land and has about 0.8% of the planet’s population...
16.10.2017
PJSC United Mining and Chemical Company continues to update fixed assets of its subsidiaries. This time, it acquired a new 25-ton crane truck priced at UAH 3.2 mn for the needs of the transport division of Irshansk Mining and Processing Plant.
30.09.2017
On September 27, the stripping complex Pivden (South) at the Vilnohirsk Mining and Metallurgical Plant was put back into operation, after its work was suspended on September 20 for maintenance.
22.09.2017
Environment experts of China have been testing the local TiO2 mines for compliance with the environment protection standards and for the level of environment pollution.
19.09.2017
The Good Begins with You – that was the name of the charity concert that took place at Metalurh Culture and Sport Palace on Friday, September 15.
18.09.2017
Now the employees of Irshansk Mining and Processing Plant, a subsidiary of PJSC UMCC, as well as Irshansk residents will be able to own a home they've been dreaming of for many years.
Administration of Vilnohirsk MMP, a subsidiary of PJSC UMCC, almost annually attends the First School Day Celebration at the schools of the town, and never empty-handed.